Wirral
Please refer to pages 27-28 of the project guide and our interactive map for more information on the proposed project boundary for this section of the route, including route sections 9 to 10 and all associated infrastructure.
Section 9 – Willaston to Leasowe, which will include the Coastal AGI
Please refer to page 27 of the project guide and our interactive map for more information on our proposals in Section 9 of the project boundary.

Section 9 explained:
Section 9 includes the pipeline from Willaston to the north coast of the Wirral at Leasowe. It will also include the Coastal AGI.
This section is in Wirral Council. In this section, to the south of Meols, we have identified a general area within which the Coastal AGI could be built. We will use your feedback and our further engineering studies to refine our plans to a smaller area.
Do you have any comments on our proposals within this section?
Section 10 – Leasowe to mean low water springs
Please refer to page 28 of the project guide and our interactive map for more information on our proposals in Section 10 of the project boundary.

Section 10 explained:
Section 10 includes the offshore pipeline from Leasowe on the north coast of the Wirral to mean low water springs.
This section is in Wirral Council.
Do you have any comments on our proposals within this section?